
Ideal for events, construction and civil projects.
The 2200L Waste Tank is the standard holding tank for grey water and sewage from a portable ablution block on a site without sewer connection. The tank sits under the ablution unit, takes waste through a standard ablution-block plumbing inlet, and empties by vacuum-truck pump-out.
Every product in the TFH range is tested to meet Australian safety standards.

Managing a construction site, event, or public gathering? Ensure safety and organisation with TFH Site Direct Crowd Control Barriers, the smart choice for managing pedestrian flow and keeping people clear of restricted or hazardous areas. Key features include fast, hassle-free installation, durable and long-lasting construction, a safe and stable design with two removable flat feet that minimise trip hazards, lightweight portability, and secure connection with two PTO lock pins per barrier. High-visibility orange for maximum safety awareness.

PVC-infill hoarding extensions (1.675m (W) x 1.43m (H)) that mount on top of water barriers, lifting total height to 2.4m and screening works for privacy and site presentation.

Our Handrail attaches to temporary fence panels to provide a compliant, continuous hand-hold for pedestrians, stairways, and elevated walkways on construction and event sites.

A steel extension bar that attaches to fence posts or panel uprights to carry barbed wire higher or at an angle above the panel top, extending the effective security reach of any temporary fence.